Ground Investigation Projects

A1 Morpeth to Felton Dualling
A3 Hindhead Improvement Scheme
A830 Arisaig to Loch Nan Uamh Improvement
Guernsey Energy from Waste Plant
Phase 2, Earth Structures Assessment Package

Grouting Projects

Reservoir and Dam Remedial Works
Consolidation of Mine Workings
Cambuslang Investment Park, Phase 1
Camlachie – Phase 6
Pollock Retail Park & Realignment works to the M77, Scotland



Phase 2, Earth Structures Assessment Package

Client: Tube Lines Limited
Combined Contract Values: £530,000

Following successful completion of the Phase 2, Earth Structures Assessment Package which was completed on time and within budget, Norwest Holst Soil Engineering Limited were awarded a further 16 sites along the Jubilee, Northern and Piccadilly Lines.

The ground investigation work on the 16 sites included cable percussive boreholes utilising the Dando 150 and our own Air Winch Rig, window sampling, hydraulic sampled holes with the Competitor 150, concrete coring, topographic surveys, hand and machine excavated trial pits, geotechnical and chemical testing along with extensive long term monitoring.

Since the start of the Phase 2, Earth Structures Assessment Package ground investigation in September 2003 Norwest Holst Soil Engineering Limited have undertaken over £530,000 worth of ground investigations at 25 sites.