Ground Investigation Projects

A1 Morpeth to Felton Dualling
A3 Hindhead Improvement Scheme
A830 Arisaig to Loch Nan Uamh Improvement
Guernsey Energy from Waste Plant
Phase 2, Earth Structures Assessment Package

Grouting Projects

Reservoir and Dam Remedial Works
Consolidation of Mine Workings
Cambuslang Investment Park, Phase 1
Camlachie – Phase 6
Pollock Retail Park & Realignment works to the M77, Scotland



Consolidation of Mine Workings

The site of the former West Hartford Colliery near Cramlington is being developed as a business park. As part of the site enablement Soil Engineering were instructed to consolidate old mine workings in the Yard Coal Seam.

The following work was completed:

• 9600 Boreholes were sunk
•  257726m of drilling
•  51000 tonnes of cement/ PFA
• Grout was injected via these holes into the workings
•  2 mineshafts were drilled and consolidated by grouting and capped by heavily reinforced concrete pads 8m square
•  1 mine adit was drilled and grouted

•  2 ponds were drained, desilted and backfilled with suitable clay
•  169000m of topsoil strip and reinstatement carried out
•  11300m of imported clay spread and compacted over the site.