Ground Investigation Projects

A1 Morpeth to Felton Dualling
A3 Hindhead Improvement Scheme
A830 Arisaig to Loch Nan Uamh Improvement
Guernsey Energy from Waste Plant
Phase 2, Earth Structures Assessment Package

Grouting Projects

Reservoir and Dam Remedial Works
Consolidation of Mine Workings
Cambuslang Investment Park, Phase 1
Camlachie – Phase 6
Pollock Retail Park & Realignment works to the M77, Scotland



A830 Arisaig to Loch Nan Uamh Improvement

Client: The Highlands Council
Contract Value: £190,000

The Highlands Council appointed Soil Engineering to determine the ground conditions for the new alignment of the A830 Trunk Road.

The ground investigation comprised trial pitting, cable percussive drilling, rotary rock drilling with core extraction, CCTV and 'Televiewer' survey, 3-arm caliper with natural gamma logging, installation of standpipes, inspection pits and/ or pavement cores in existing carriageway along with sampling and in situ testing.

The whole of the investigation was undertaken in environmentally sensitive areas with a number of borehole positions within a Special Site of Scientific Interest (SSSI) and a candidate Special Area of Conservation (cSAC). Further restrictions were due to the investigation positions being within areas of extremely difficult access.