

Due to the constraints of a Section 61 Notice, the Sheet Piles could not be driven through granular strata using a hammer, and were vibrated into place. Several piles failed to fully penetrate very dense River Terrace Deposits and seal into the London Clay below. The resulting gaps had to be “plugged” in order to ensure the safety of operations within the cofferdam, and to prevent free running material flowing into the excavation.
Soil Engineering designed a solution utilising pressurized microfine cementitious grout to both densify and consolidate the Terrace Gravel material. The Microfine Cement allowed the grout to permeate more effectively at low pressure further than OPC based Grout, ensuring that the grout could form an extended envelope beyond the area of densification, providing a seal across the gaps in the sheet piles. Grout was also injected into the upper 1m of the underlying London Clay, to ensure the seal tied into the fissured clay, and shut off the water pathway.
On acceptance of SEGL’s design by the client, the site crew were able to mobilise a Soilmech SM-8 drilling Rig, and Bauer hydraulic colloidal mixer/pump assembly in 1 week, to undertake the works under the supervision of a Soil Engineering Senior Engineering Geologist.
Geotechnica 2026 provided another busy showcase of Soil Engineering’s capabilities The two-day event in Warwickshire saw a significant number of Soil Engineering’s leadership team populating the event stand, and even more visitors trying their hand at this year’s event challenge. Mixing fun and serious networking, the reactions game provided a perfect backdrop to discussions on […]
Read more ➜
Sonic Drilling “resonates” at Soil Engineering Geoservices With a recent expansion of our in-house rig fleet from one sonic drilling rig to four, our nationwide capability has never looked better. The acquisition of a second Eijkelkamp Fraste CRS XL140 Duo twin-head rotary/Sonic drilling rig alongside a more compact Eijkelkamp Fraste SRS ML Duo, and the […]
Read more ➜
As 2025 draws to a close, and our business travels wind down, we’re reflecting on some of the journeys made throughout the company this yearJourneys to the depths… Our rotary coring crews have been plumbing new depths, with a company record set on Merseyside when a cored borehole reached just over 300m, recovering 105mm core […]
Read more ➜