As part of a local infrastructure renewals programme Soil Engineering Geoservices Limited (SEGL) were engaged under the National Highways Ground Investigation Framework to complete an investigation on the A66 at Long Newton, near Middlesborough. Improvements to street lighting require the installation of new ducting, some by directional drilling, and so a ground investigation was designed by Kier to define key site parameters.
Delivered on night shifts to minimise disruption on the busy arterial route, the works were undertaken on verges and in the central reservation under traffic management designed and programmed collaboratively between the project stakeholders to maximise productivity. A total of thirteen locations were drilled across the project, following PAS128 surveys to confirm services clearances. Test holes penetrated the underlying boulder clay by up to 6m, providing samples for logging and testing.
With samples logged onsite, subsamples were then shipped to our laboratory for a suite of geotechnical tests, whilst log information was reported daily to the designers, supporting proactive review of data during the site period. The Kier Engineering Team commented in a project review “Reporting was good, and very accurate…Data delivery left us very happy”.
Reviewing the planning and delivery of the site work, which involved multiple stakeholders and location redesign based on SEGL feedback, the Kier and National Highways teams agreed “Buildup was good, everyone worked together effectively”.
SEGL are looking forward to returning to the scheme to complete a second phase of works on an adjacent area, building on this successful framework-based project delivery relationship.
You can download a copy of this case study here
Staff, Suppliers, Consultants and Clients all pulled together for this year’s Safety Week “Tour de Soil Engineering” racking up the miles for mental health. An inclusive event across the business, the Tour saw walkers, runners and of course cyclists grinding away through the week in a cumulative challenge to cover the 799 non-motorway route. Virtually […]
Read more ➜The “Tour de Soil Engineering” sees the first half of our Safety Days event aligned with Mental Heath Awareness Week in a team challenge supporting MIND across the UKMental Health Awareness Week (12th to 18th May) will see Soil Engineering staff and project partners nationwide join forces to ride and walk over 700 miles from […]
Read more ➜The UK’s Water Industry National Environment Plan, or WINEP, currently requires water companies to undertake over 24,000 actions related to water quality and biodiversity, supported by investment totalling over £22 billion. As well as headline projects such as United Utilities’ HARP, Southern Water’s Havant Thicket reservoir, Water Companies across England are undertaking numerous smaller improvement […]
Read more ➜